Blasting

2026, v.43;No.181(03) 112-120+178

[Print This Page] [Close]
Current Issue | Archive | Advanced Search

Numerical Simulation Study on Residual Blasthole Length of Auxiliary Holes in Hard Rock Tunnel Blasting

YUAN Yue-ming;XU Bang-shu;LIU Hong;CAI Hui;FAN Fei-fei;LIU Hong-liang;GAO Lei;WANG Zhuo-xuan;

Abstract:

In tunnel blasting operations,the performance of auxiliary holes following initial cut blasting critically influences subsequent excavation progress and operational efficiency. The residual borehole length after auxiliary-hole detonation is a crucial parameter for assessing both the efficiency of blasting energy utilization and the effectiveness of rock fragmentation. This study investigates the impact of the residual borehole length after auxiliary-hole blasting in hard-rock tunnels on subsequent excavation performance,using the Fangshan Tunnel as a case study. A three-dimensional dual-borehole model was developed in Hypermesh with localized mesh refinement around blast holes. LS-DYNA simulations were conducted to analyze residual hole lengths under varying inter-hole delay times and geological conditions,with key parameters systematically configured for blast dynamics analysis. This research systematically examines the governing patterns of inter-hole delay time and surrounding rock mass on the residual borehole length in auxiliary holes,employing advanced numerical simulation techniques for comprehensive parametric analysis. The results demonstrate that the inter-hole delay time significantly influences residual borehole length,with longer delay times within a specific range increasing residual length and accelerating growth rate. Furthermore,the lithology of the surrounding rock mass emerges as a critical determinant of residual length,with granite exhibiting longer residual holes than sandstone under identical charging conditions,revealing a positive correlation between the rock firmness coefficient and residual hole dimensions. Field verification was conducted using optimized auxiliary hole blasting parameters derived from this study. The implementation of these parameters in actual construction effectively controlled the residual borehole length and significantly enhanced blasting performance in hard-rock tunnel excavation. The findings establish both theoretical foundations and methodologies for precision design and dynamic adjustment of auxiliary hole blasting parameters in hard rock tunnel excavation,offering substantial value for enhancing construction efficiency and optimizing project economics in tunneling operations.

Key Words: numerical simulation;hard rock tunnel;tunnel blasting;auxiliary hole;residual hole

Abstract:

Keywords:

Foundation: 国家自然科学基金(52379102)深埋隧道开挖扰动围岩能量释放特征与吸能支护结构协同作用机理;国家自然科学基金(50909056)海底隧道覆盖岩层失稳机理及最小岩石覆盖厚度分析方法研究;; 山东省自然科学基金(ZR2021QE246)层状岩体隧道爆破开挖围岩成型机理及爆破参数智能优化方法~~

Authors: YUAN Yue-ming;XU Bang-shu;LIU Hong;CAI Hui;FAN Fei-fei;LIU Hong-liang;GAO Lei;WANG Zhuo-xuan;

References:

Accessibility
Information
Service
Key Words
The author of this article
Cnki
Share