Blasting

2026, v.43;No.181(03) 78-87+150

[Print This Page] [Close]
Current Issue | Archive | Advanced Search

Study on Pillar Stability and Control Strategies Incorporating Blasting-induced Damage Effects During Stope Excavation

ZHANG Xiang-yu;HAN Hua-ye;YAN Peng;YANG Zhao-wei;LUO Sheng;XU Meng-yu;WU Jia-yao;ZHU Yong-sheng;

Abstract:

Given the substantial explosive volumes and charges involved in underground room-and-pillar mining operations,blasting-induced damage to retained pillars becomes severe,compromising structural integrity and potentially triggering catastrophic failures. This study established a mathematical correlation between necessary pillar safety width and height while accounting for blasting damage effects,revealing how conventional designs that neglect such damage may dangerously overestimate both pillar dimensions and load-bearing capacity. A 20 m × 80 m × 80 m pillar structure from a representative mining area was taken as a case study. Utilizing parameters derived from laboratory uniaxial compression and Brazilian splitting tests,an ANSYS/LS-DYNA model of fan-pattern long-hole blasting was developed to analyze pillar damage and vibration characteristics under simultaneous initiation versus millisecond-delay initiation(25 ms and 50 ms). Findings reveal that simultaneous initiation causes stress wave superposition,resulting in unilateral damaged depths of 4 ~ 5 m,while delayed initiation reduces damage to approximately 3 ~ 3. 5 m(25 ms delay) and about 2 m(50 ms delay). Additionally,a practical implementation scheme is proposed that combines a 50 ms interval delay with an optimized detonation sequence. This approach prioritizes creating localized free surfaces to direct energy dissipation toward excavated voids,reducing average surrounding rock damage depth to 1 ~1. 5 m while decreasing pillar surface peak vibrations by approximately 16. 6%. These findings provide practical guidance for pillar-width design and blasting damage control in room-and-pillar mining operations.

Key Words: blasting damage;mining rooms and pillars;underground mines;numerical simulation

Abstract:

Keywords:

Foundation: 水资源工程与调度全国重点实验室开放研究基金(2025SGG08);; 国家自然科学基金(NO.52379108、52509179)~~

Authors: ZHANG Xiang-yu;HAN Hua-ye;YAN Peng;YANG Zhao-wei;LUO Sheng;XU Meng-yu;WU Jia-yao;ZHU Yong-sheng;

References:

Accessibility
Information
Service
Key Words
The author of this article
Cnki
Share